CUSTOM SHOWER REMODELING / HOUSTON
A better shower.
A better everyday.
A look you love. Details that work for you.
Designed together, right in your home.
01 / A different everyday
A space that works.
A feeling that lasts.
From simple fixture updates to complete shower overhauls, we create showers that look great and work perfectly. Custom tile, frameless glass, rain heads, body jets—whatever your vision, we bring it to life.
A real transformation / Spring, Texas
Same home.
A new way to start the day.
This Spring bathroom traded its old tub for a walk-in shower with Santorini White walls and Venetian Bronze fixtures.
- The change
- Tub-to-shower conversion
- The finish
- Santorini White
- The details
- Venetian Bronze fixtures
BEFOREAFTER Drag to compare · Two views of the same bathroom renovation
The interactive studio / Onyx solid surface
Don't just picture it.
Explore it.
Turn the shower. Compare wall patterns. Try a lighter or darker palette. Start a conversation with a clearer idea of what you like.
Discuss this look

Gloss
Quiet, uninterrupted surfaces. The smooth gloss finish gives your shower a clean, classic feel.
Concept preview only. Patterns, colors and dimensions are illustrative. Your designer confirms actual samples, available combinations and measurements.
Who It's For
Is this right for you?
- Homeowners tired of a dated or dingy shower
- Those wanting custom tile or frameless glass upgrades
- Anyone looking to improve water pressure or shower features
What's Included
Everything we handle
- Demolition of existing shower materials
- Waterproofing and backer board
- Custom tile installation (walls and floor)
- Shower pan or linear drain
- Fixtures: valve, showerhead, hand shower
- Frameless or framed glass enclosure
- Niche or corner shelf installation
- Grout sealing and final cleanup
Our Process
On time. On budget.
Out of your hair.
Most of our materials are custom built and typically take 8–11 weeks to arrive after ordering. Once materials are in, our office calls to schedule installation. As a planning rule, allow about one week of installation for each $10,000 of project scope; your designer will confirm the schedule for your bathroom. Custom glass typically takes another 7–10 days after the shower is complete.
Questions
Frequently asked
- How long does a shower remodel take?
- Most of our materials are custom built and typically take 8–11 weeks to arrive after ordering. Once materials are in, our office calls to schedule installation. As a planning rule, allow about one week of installation for each $10,000 of project scope; your designer will confirm the schedule for your bathroom. Custom glass typically takes another 7–10 days after the shower is complete.
- What's the advantage of frameless glass?
- Frameless glass looks cleaner, makes the bathroom feel larger, and is easier to keep clean than framed enclosures.
- Can you add a rain showerhead?
- Yes. We install ceiling-mounted rain heads, wall-mounted rain heads, and multi-function shower systems with body jets.
- What tile is best for showers?
- Porcelain and ceramic tiles are most common. Natural stone is beautiful but requires sealing. We'll help you choose based on style and maintenance preferences.
- Do you install steam showers?
- Yes, we can install steam generators and properly seal the enclosure for steam shower functionality.
Ready for your shower remodels?
Schedule a free in-home consultation. We'll discuss your project, answer your questions, and provide a detailed quote.
(281) 968-3000